OCCUPY 8 FOOT WIDTH OF ROADWAY ADJACENT TO NORTH CURB LINE, OCCUPY 8 FOOT WIDTH OF ROADWAY ADJACENT TO SOUTH CURB LINE, OCCUPY 8 FOOT WIDTH OF ROADWAY ADJACENT TO EAST CURB LINE, OCCUPY 8 FOOT WIDTH OF ROADWAY ADJACENT TO WEST CURB LINE, OCCUPY 11 FOOT WIDTH OF ROADWAY ADJACENT TO NORTH CURB LINE, OCCUPY 11 FOOT WIDTH OF ROADWAY ADJACENT TO SOUTH CURB LINE, OCCUPY 11 FOOT WIDTH OF ROADWAY ADJACENT TO EAST CURB LINE, OCCUPY 11 FOOT WIDTH OF ROADWAY ADJACENT TO WEST CURB LINE, OCCUPY 20 FOOT WIDTH OF ROADWAY ADJACENT TO NORTH CURB LINE, OCCUPY 20 FOOT WIDTH OF ROADWAY ADJACENT TO SOUTH CURB LINE, OCCUPY 20 FOOT WIDTH OF ROADWAY ADJACENT TO EAST CURB LINE, OCCUPY 20 FOOT WIDTH OF ROADWAY ADJACENT TO WEST CURB LINE. (212) 839-8857 Existing InfrastructurePermittees must not remove parking meters, traffic signs, street lights, street furniture, and similar items unless authorized on the permit. United States Department of Transportation, Book of Standards for Highways and Incidental Structures, Construction and Traffic Standard Details, Design Standards and Specifications Drawings, PDF, DGN (freely available login required), PDF, DGN (individual division details also available). If a permit application includes permit requests to work on embargoed streets within 90 days prior to the start of the HE (November 16th), the permittee will be presented with a warning, during the application process, stating that such permit request(s) will be subject to the upcoming HE. Specific requirements for filling in abandoned vaults can be found in Section 2-13(o) of the Highway Rules. If the existing sidewalk is the structural roof of a vault or other opening, a DOB-approved plan for the restoration of the sidewalk, must be submitted as part of the application process. NYC DOT coordinates street opening and other construction on streets. ALL MITIGATIONS INCLUDING: VARIABLE MESSAGE BOARDS, NYPD INTERSECTION TRAFFIC AGENTS, CONSTRUCTION, PARKING, AND BUS STOP SIGNAGE MUST IN PLACE AND MAINTAINED FOR THE LIFE OF THE PROJECT. 8:30 AM to 4:30 PM, Manhattan Suspension of Application Review NYC DOT may suspend the review of applications for permits pending: Refusal to Issue Permit NYC DOT may refuse to issue a permit to an applicant: Voiding and Reissuing of Permits. Different from DOB, DOT plans requires 600 PSF live loads on all sidewalk doors, gratings, covers and vault structures. FULL BLOCK SEGMENT RESTORATION IS REQUIRED FOR THE LENGTH OF THE ROADWAY CURB TO CURB. THIS PERMIT ALLOWS FOR INSTALLATION OF TEMP ROADWAY/PAVEMENT MARKINGS AND/OR TEMP CONSTRUCTION REGULATORY SIGNS AS PER APPROVED MPT PLANS. Manuals and Standards. ALL UTILITY COMPANIES SHALL BE REQUIRED TO INSTALL THEIR UTILITIES &/OR CONDUITS A MINIMUM OF 18 INCHES BELOW THE ROAD WAY SURFACE OR BASE WHICHEVER IS GREATER AS PER NYC DOT HIGHWAY RULES & REGULATIONS 2-11(11)(VII). REQUIRES LOWER MANHATTAN BOROUGH COMMISSIONER'S OFFICE (LMBCO) REVIEW. The suspension does not apply to emergency authorizations and permits (see Section 3.6.1 Emergency Utility Access Cover Openings and Emergency Street Openings). font size. DOT SIGNALS APPROVED PLANS. BQE Central Workshops. Some of the construction-related activities covered under this category include placement of materials, equipment and temporary structures on the street or sidewalk (e.g., building materials, cranes, boom trucks, a shanty or trailer, construction container, security structure, tool cart, or construction parking regulation signs) or movement of construction equipment across roadways and sidewalks. SECTION24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. Designers and contractors should refer to the specifications listed below with special attention to the Construction & Material Specifications; Highway Lighting, Traffic Control, and Intelligent Transportation . PLACE LEFT LIGHTED ARROW BOARD 24/7 NE CORNER OF AMSTERDAM AVE/W.60 ST. NO IMPACT ON 4 TRAVEL LANES AT ANY TIME. View information on how to navigate and use NYCityMap. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. To release an FCR hold, the applicant must demonstrate that either he or she has begun the CRIA process or that the CRIA statement is not required. It includes capital construction projects. Kew Gardens, NY 11424 Street Opening Permits are generally taken out by entities that need access to subsurface infrastructure, including utility companies and contractors, such as licensed master plumbers. The requested permit must be appropriate for the type of work that is planned. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. Tel: (718) 875-7428 Street Arterial Maintenance (SAM) hold A Street Opening Permit request to perform work on a protected street will automatically have a SAM hold placed on it if the proposed work start date is within 18 months of the street being resurfaced/reconstructed. The milling and resurfacing schedules are organized by borough and are sent electronically each week to utility companies and other city agencies. New York, NY 10007-1216 NYC Parks & Recreation 280 Broadway, 3rd Floor INTRES-RESTORE AS PER SKETCH #7 OF DOT'S PROTECTED STREET RESTORATION REQ'MENTS. TO FRI. OTHER TIMES OCCUPY 11 FEET ADJACENT TO SOUTH CURB ONLY. No attachments of any kind are permitted on a canopy, including, but not limited to temporary or permanent signs, balloons, streamers, flags, banners or pennants. A separate Occupancy of Sidewalk Permit is required if a minimum of 5 feet cannot be maintained on the sidewalk for unobstructed pedestrian passage. New York, NY 10038 In order to apply for a permit, an applicant must first register in person with NYC DOT by submitting a completed Permittee Registration Application. It also covers installations above the street such as banners and decorative lights and permanent installations on the street such as bike racks. Email: DOT.TrafficElectrical@ct.gov, Any corrective action required by the CAR must be performed within 30 daysof the issuance of the CAR. The Street Design Manual is New York Citys comprehensive resource for street design standards, guidelines, and policies. A permit is required to place any construction trailer or similar structure in the street. A 4' X 4' FIXED ORANGE CONSTRUCTION SIGN WITH 5" BLACK LETTERING MUST BE PLACED A MINIMUM OF 7 CALENDAR DAYS PRIOR TO CLOSURE AT A LOCATION ENTERING THE STREET TO BE CLOSED. If all information is satisfactory the applicant is approved and the system auto-generates an email which is sent to the applicant with the EAN. PAVEMENT MUST BE RESTORED IN KIND. ONE ADDITIONAL LANE ADJACENT TO THE ENCLOSED WORK ZONE MAY OCCUR 12:01 AM - 5 AM NIGHTLY WITH NO NOISE OPERATIONS. Attn: Forestry HIQA also releases many holds. NYC DOT issues permits for two types of vaults: building vaults and transformer vaults. With advance notice of proposed excavation work, NYC DOT can sequence the timing of the large number of roadway and utility works being undertaken across the city. WALKWAY IN ROADWAY MAY BE CLOSED 8AM- 4:30PM MON - FRI OPEN ALL OTHER TIMES. HIQA will determine whether an inspection of the work site is warranted to establish existing conditions before work begins. West NYC DOT has a separate procedure for obtaining authorization for emergency utility access cover openings so that applicants can expeditiously perform such work. ONE 11 FOOT LANE MAY REMAIN CLOSED FOR CONCRETE CURING ONLY FOR MAXIMUM OF48 HOURS. The applicant must satisfy all of the requirements listed in section 2-02(a) (3) of the. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. If guide sheets are to be included in a project, they should be included in a subset under that project. A list of the forms most commonly used during this process can be found inAppendix B, Forms. THIS STIP IS USED FOR BPP PLANS AND REQUIRES THE CONTRACTOR TO RESTORE HALF THE ROADWAY PLUS 5'. MICROSTATION SHEET MODELS. Office Hours: MondayFriday from 9:00 AM to 5:00 PM, New York City Department of Environmental Protection (DEP) The Highway Rules, Section 2-02(k) contains additional information. WORK 10 PM TO 6 AM NIGHTLY. CANNOT WORK WHEN GOWANUS EXPRESSWAY HAS MORE THAN 1 LANE CLOSED SOUTHBOUND. The construction of any vault that extends beyond the curb must be authorized under a revocable consent agreement, as required in Section 2-13(c) of the Highway Rules, in addition to approval by PEU. WORK CROSSING THE ROADWAY CAN NOT EXTEND MORE THAN 11 FEET AT A TIME. DOTs lighting-levels and uniformity guidelines are based on those established by the IES Roadway Lighting standard RP-8-14 (or more stringent where needed). CPI holds are regularly released by the borough Administrative Superintendent of Highway Operations (ASHO) if the proposed work does not interfere with the in-house street resurfacing operation. BLKRES-RESTORE AS PER SKETCH #4 OF DOT'S PROTECTED STREET RESTORATION REQ'MENTS. LANE CLOSURES MAY NOT OCCUR WHEN TWO LANE CLOSURES OCCUR ON GOWANUS OR ON RAMPS LEADING TO 3RD AVENUE. New York City streets include a complex mix of assets such as electric, gas, telephone, cable, water, sewer and steam lines, requiring coordination among the different asset owners when street work is performed. New York, NY 10041 AND NYCTA. PERMITTEE MUST NOTIFY NYPD/TRAFFIC MANAGEMENT CENTER 48 HOURS PRIOR TO CHANGING ANY SIGNS/MARKINGS. Immediately upon completing the compaction of the backfill of any street opening/excavation, a temporary pavement of an acceptable asphalt paving mixture not less than 4 inches thick after compaction must be installed flush with the adjacent surfaces; or, If plating or decking will be used, the size of the plate or decking must extend a minimum of 12 inches beyond the edge of the, Permanently Restored Opening / Excavation. DESIGNATED AS COBBLESTONE STREET. WORK HOURS ARE EASTBOUND 7 AM TO 3 PM OR WESTBOUND 10 AM TO 4 PM, MONDAY THROUGH FRIDAY, WORK MONDAY TO FRIDAY 10 AM-4 PM, SATURDAYAND SUNDAY, WITH NO NOISY OPERATIONS AFTER MIDNIGHT. WORK ALLOWED 8 AM TO 4 PM SATURDAY. PERMITTEE IS PARTICIPATING IN CORE DRILLING PILOT PROGRAM. DOT is committed to making our streets and sidewalks networks accessible to all, particularly aging New Yorkers and persons with disabilities. 1FTRES-RESTORE AS PER SKETCH #9 OD DOT'S PROTECTED STREET RESTORATION REQ'MENTS. See Chapter 3Permits and Approvals for more information. A list of construction embargoes under way at any given time can be found on the Construction Embargoes page on NYC DOT's website or at the borough Permit Offices. Similarly, the sooner a potential street excavator knows about NYC DOT's intent to work in a particular location, the better it can make arrangements to avoid or reduce potential conflicts. ON STIP 109). SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. THIS PERMIT ONLY ALLOWS FOR THE CLOSURE OF A ROADWAY OR SIDEWALK AS STIPULATED. For Further Information: Following issuance of the Emergency Street Opening Permit Number, the permittee must submit an application for a regular Street Opening Permit within two business days (Highway Rules, Section 2-11(g)). MAY WORK 24/7, OCCUPY CURB LANE, ALL EQUIPMENT, STORAGE OF MATERIAL ALLOWED. The full list of rules and regulations is contained in the Highway Rules, Sections 2-02 and 2-04, and should be consulted before any work is performed on the street. A SEPARATE 221 PERMIT IS NOT REQUIRED FOR CAPITAL/GOVT PROJECTS. PEU performs the initial review of all applications for building vault permits and licenses. 16 Court Street, 7th Fl. In order to assist the goal of advanced coordination, information about planned NYC DOT projects is available via theDOTMapportal within the NYCityMapwebsite. The goal of advance coordination is to reduce the number of excavations in New York City streets. PERMITTEE SHALL NOT DISRUPT OR DAMAGE SENSORS INSTALLED WITHIN THE PARKING_LN. THE TRAFFIC STIPULATIONS ON THIS PERMIT DO NOT GO INTO EFFECT AS LONG AS THE CONTRACTOR CONTINUES TO WORK NON-STOP, AROUND THE CLOCK, TO CORRECT THE EMERGENCY SITUATION. Upon satisfactory payment, the hold(s) will be released. MUST COORDINATE WITH RESIDENT ENGINEER NYSDOT MR.WONG AT 718-499-7075 PRIOR TO WORK. ONE LANE MAY REMAIN CLOSED, FOR CONCRETE CURING ONLY, FOR A MAXIMUM OF 48 CONSECUTIVE HOURS MONDAY TO FRIDAY IF WEEKDAY WORK HOURS ARE GRANTED, OR FROM 12:01AM SATURDAY THROUGH 6AM MONDAY IF WEEKEND OR NIGHTLY (7 NIGHTS) WORK HOURS ARE GRANTED. To request release of the hold, the permittee must contact HIQAs central office or one of the borough offices to update the file. APPROVAL FROM NYCDOT HIQA BOROUGH OFFICE IS REQUIRED BEFORE WORK COMMENCES. Application for a canopy installation involves three major steps. 42 Broadway For hearings, 1st, 2nd, 3rd, and 4th Wednesdays and Thursdays of the month from 8:30 AM to 3:30 PM THIS PERMIT IS BEING ISSUED WITH THE UNDERSTANDING THAT THE PERMITTEE IS RESPONSIBLE FOR CURB TO CURB RESTORATION AS AGREED TO WITH THE BOROUGH ASHO'S OFFICE. Brooklyn, NY 11211 Non-Freeway, Special, 211th Street and 23rd Avenue, Queens Riverside Drive, Manhattan Benefits Enhances pedestrian safety and accessibility by reducing crossing distances and providing refuge for pedestrians to cross road in stages Calms traffic, especially left turns and through-movements, by narrowing roadway at intersection The applicant will be able to pick up the permit from the Permit Office in the borough in which the canopy is located upon payment of the appropriate fee. Further information on permits is available in Chapter 3 Permits and Approvals. During the final design stage of a city project, DDC will also hold a series of alignment meetings with the utilities and other agencies to inform them about proposed changes to the location of street infrastructure that would require facility relocation. Regular Input and Attendance of Decision Makers at Coordination Find community presentations. Permeable Interlocking Concrete Paver (PICP), Provides space for walking, the most widely used mode of travel in New York City, Creates linkages to transit and connects neighborhood destinations, Facilitates straight and unobstructed pedestrian movement, free of vehicle conflicts except at intersections and driveways, With adequate width, can provide space for staying activities such as relaxing, shopping, eating, and socializing, Coordinate streetscape/utility work to minimize street cuts, On both sides of all streets that are 22 feet wide or wider. Typically, permits must be kept at the work site or designated field headquarters at all times and must be made available for inspection. If this is not possible, sketches or drawings must be submitted, in duplicate, showing the proposed method of treatment to NYC DOT for approval. WORK 9 AM TO 7 PM SATURDAY AND 10 AM TO 7 PM SUNDAY. For all permit applications including permit requests to work on embargoed streets through the HE period, the permittee will be automatically charged an additional $135 HE application review fee. FULL CURB TO CURB RESTORATION WILL BE REQUIRED FOR THE ENTIRE LENGTH OF THE WORK. The following section provides information on some issues that may delay the issuance of a permit or that may lead to the revocation of a permit. WORK HOURS ARE NORTHBOUND 7 AM TO 3 PM OR SOUTHBOUND 10 AM TO 4 PM, MONDAY THROUGH FRIDAY, WORK HOURS ARE NORTHBOUND 10 AM TO 4 PM OR SOUTHBOUND 7 AM TO 3 PM, MONDAY THROUGH FRIDAY, WORK HOURS NORTHBOUND 7 AM TO 3 PM OR SOUTHBOUND 10 AM TO 6 PM, MONDAY THROUGH FRIDAY, WORK HOURS ARE NORTHBOUND 10 AM TO 6 PM OR SOUTHBOUND 7 AM TO 3 PM, MONDAY THROUGH FRIDAY, WORK HOURS ARE EASTBOUND 10 AM TO 4 PM OR WESTBOUND 7 AM TO 3 PM, MONDAY THROUGH FRIDAY, WORK HOURS ARE EASTBOUND 7 AM TO 3 PM OR WESTBOUND 10 AM TO 6 PM, MONDAY THROUGH FRIDAY, THIS PERMIT IS VOID IF INSURANCE IS NOT RENEWED TO COVER PERIOD OF THIS PERMIT, WORK HOURS ARE EASTBOUND 10 AM TO 6 PM OR WESTBOUND 7 AM TO 3 PM, MONDAY THROUGH FRIDAY, THE PERMITTEE IS REQUIRED TO INSTALL, MAINTAIN, AND REMOVE ALL NECESSARY TEMPORARY PARKING AND REGULATORY SIGNS AND PAVEMENT MARKINGS AND RESTORE TO THEIR ORIGINAL CONDITION PER NYCDOT STANDARDS PRIOR TO THE EXPIRATION OF THE PERMIT. WORK MAY OCCUR 24 HOURS A DAY, SEVEN DAYS A WEEK. MOBILAZATION OF PROJECT INCLUDING RE-STRIPPING OF ROADWAY AND INSTALLATION OF BARRIERS WORK ONLY 10PM TO 6AM MON TO FRI AND 10PM TO 8AM SAT AND SUNDAY. LMZ (Lower Manhattan Zone) hold This hold signifies that you are working on a street that falls within the Lower Manhattan Zone (south of and including Canal Street). Further information on responding to ECB violations may be found on the ECB website. Additionally, High Density Polyethylene (HDPE) conduit, a more cost-effective material that is not susceptible to corrosion from residual salt water after storm surge events, is replacing galvanized steel for all signal locations and street light locations in flood-vulnerable areas. BACKFILL OR PLATE BEFORE PROCEEDING. NO LANE CLOSURES PERMITTED TWO HOURS PRIOR TO BARCLAYS CENTER EVENTS THROUGH TWO HOURS AFTER THE EVENT HAS ENDED. OCCUPY A MAXIMUM OF 12 FT OF ROADWAY FOR ASBESTOS REMOVAL ONLY BETWEEN THE HOURS OF 7PM - 6AM, MAINTAIN TWO 11 FOOT LANES, ONE 11 FOOT LANE ON EACH SIDE OF THE EXISTING DOUBLE YELLOW CENTER LINE, MAINTAIN FOUR 11 FOOT LANES, TWO 11 FOOT LANES ON EACH SIDE OF THE EXISTING DOUBLE YELLOW CENTER LINE, MAINTAIN TWO 11 FOOT LANES, ONE 11 FOOT LANE ON EACH SIDE OF THE EXISTING CENTER MALL. See the Highway Rules, Section 2-02(j). WAIVER TO WORK DURING 2010 HOLIDAY EMBARGO GRANTED FOR THIS PERMIT. 10 Richmond Terrace, Room 308 The applicant submits a completed Canopy Authorization Application, which must include the following: Written approval from the owner of the property to which the canopy will be attached. (718) 222-7307 Some permit types can also be processed at the relevant borough office. APPLICANT INFORMATION (JOINT VENTURE), 1D. All applications for construction or repair of a transformer vault must be accompanied by an electric utility company layout, and must comply with the minimum clearance requirements for transformer vaults unless an approval or waiver is obtained from the appropriate agency or utility (more information is available in. Standard Drawings are not currently available for download from the shaded states. CONTAINER SHALL NOT BE STORED OR PLACED WITHIN: (I) "NO STOPPING","NO PARKING ANYTIME" OR "AUTHORIZED PARKING" AREAS. See Section 3.4 Canopy Authorization and Permits for more information. SECTION24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. View more information and instructions for obtaining a revocable consent. At crossings, the height of Accessible Pedestrian Signals must be reachable by a person using a mobility device, at a preferred height of 42 inches and a maximum height of 48 inches (see, Existing foundations at traffic signal locations in certain flood-vulnerable areas are being replaced with coastal storm foundations that incorporate a square concrete pedestal raising the electrical components above some flood depths. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. A temporary sidewalk closure while a sidewalk repair is underway. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. OBTAIN THE MUTCD AT, OCCUPY 8 FOOT WIDTH OF ROADWAY ADJACENT TO CURB. For hearings, Monday to Friday from 8:30 AM to 3:30 PM. Emergency work will not be placed on hold and shall proceed in accordance with Highway Rules, Section 2-11 (g). NJDOT Engineering Department of Transportation Engineering The Engineering area contains most of the reference material needed to design and construct a Capital Program project. Whenever a permit has been issued in error and the conditions are such that the permit should not have been issued. SECTION 5: DESIGNATED REPRESENTATIVE(S) TO ACCEPT SERVICE OF SUMMONS AT THE APPLICANT'S BUSINESS OFFICE: Enter the names of at least two people who are authorized to accept summonses for his/her corporation and who are located at his/her business address. THE ROADWAY AND/OR SIDEWALK SHALL BE REPLACED IN-KIND. At the foundation of the city that never sleeps lays a network of streets that helps keep New York and New Yorkers moving forward. BUG Ratings DOT Street Lighting evaluates LED luminaires using the IES BUG (Backlight, Uplight, and Glare) rating system as part of its specifications. Kew Gardens, NY 11424 CONTRACTOR SHALL BE RESPONSIBLE FOR ALL EQUIPMENT, VEHICLES AND PERSONNEL ON OR AROUND WORK SITE. NO WORK SHALL BE PERFORMED UNDER THIS PERMIT UNLESS ACCOMPANIED BY AN ACTIVE TYPE 208 & 215 PERMIT. The Third Edition of the Street Design Manual renews the Manuals status as a living document and reinforces its role as a critical resource for those working on projects in New York Citys public right-of-way. ISSUED. THE PERMITTEE MAY BE REQUIRED TO PAY STATION DEACTIVIATION AND/OR REMOVAL CHARGES. Permanent RestorationUpon completion of work in a street, permittees are required to restore all street openings/excavations in accordance with the Highway Rules, Section 2-11(e) including, but not limited to, the following required restoration elements: Temporary RestorationIf street opening/excavation work remains unfinished at the end of the day, the permittee must perform temporary repairs in accordance with the Highway Rules, Section 2-11(e) including, but not limited to the following requirements: Street restoration following utility work, 18th Street and Irving Place, Manhattan. All other times - (718) 433-3340, From 7:00 AM to 3:30 PM, Monday to Friday: (212) 839-9697/99 or 9688 * Clear Path (pedestrian walkway): This directive is intended to provide pedestrians with the maximum amount of safety and space to traverse the sidewalk. FULL CORNER QUADRANT RESTORATION IS REQUIRED FOR ALL CORNER QUADRANTS EXCAVATED. An EAN is required for each utility access cover opening at a location, provided that the work is performed around the clock until the emergency is eliminated, at which time the EAN expires. If the location is deemed suitable, HIQA signs the Canopy Authorization Form indicating HIQA approval and returns it to the applicant. State Standard Drawings See the state links below for available standard drawings. Any work is subject to suspension during an NYC DOT-issued. 233 Schermerhorn Street, 11th Floor Questions regarding permit registration can be directed to the central Permit Office. NYC Parks & Recreation Canopy authorizations and permits are required to place a canopy over the sidewalk. DOT Street Lighting's, Permeable Interlocking Concrete Paver (PICP), Illuminating Engineering Society of North America. A copy of the form can also be foundin Appendix B, Forms. THIS PERMIT IS BEING ISSUED WITH THE UNDERSTANDING THAT THE PERMITTEE IS RESPONSIBLE FOR ORIGIN TO DESTINATION FOR DISTANCE OF TRENCH CURB TO CURB AS AGREED TO WITH THE BOROUGH ASHO'S OFFICE. Any emergency work on a street that involves opening a utility access cover to gain access to an underground facility on a critical street during restricted hours requires an EAN. NO OCCUPANCY OF ROADWAY OF PERMITTED AFTER WORKING HOURS. MAINTAIN ONE 11 FOOT LANE FOR THRU TRAFFIC 9 AM TO 2 PM AND 3:30 PM TO 6 PM MON. It seems that JavaScript is not working in your browser. Visit the DEC website at the following address to determine the appropriate contact http://www.dec.ny.gov/63.html, Metropolitan Transportation Authority (MTA) Bus Operations Tel: (212) 788-3071 Upon completion of work, sidewalks must be restored according to Highway Rules, Section 2-09(f)(4) and NYC DOT Standard Highway Specifications. Most vault work also requires plan approval and a permit from DOB. Municipal Building MAINTAIN 2 LANES SOUTHBOUND AND 1 LANE NORTHBOUND FROM 7AM-9AM M-F. It is important that contractors and utility companies are responsible partners as well in order for coordination to be effective. WORK ALLOWED 8 PM TO 6 AM NIGHTLY. ALL WORK OPERATIONS MUST BE RESTRICTED WITHIN 11 FEET OF THE NORTHEAST QUADRANT OF THE INTERSECTION. THIS PERMIT INCLUDES THE OCCUPANCY OF THE ROADWAY AND OR SIDEWALK BY BARRIERS FOR THE PURPOSE OF SAFETY AND PROTECTION SURROUNDING THE OPEN UTILITY COVER WHILE MAINTAINING A SHUNT. 24 West 61st St., 5th Fl. Thousands of miles of utility pipes, cables and other equipment are beneath the streets of New York City. Brooklyn, NY 11201 Fax: (718) 699-7491 The contact information and hours of operation can be found in Appendix C, NYC DOT Contact Information. NYC Parks & Recreation New York State Code of Rules and Regulations, Laws of New York(use this webpage to search for the below laws), Administrative Code of the City of New York, Zoning Resolution of the City of New York, American Association of State Highway and Transportation Officials (AASHTO), Institute of Transportation Engineers (ITE), National Association of City Transportation Officials (NACTO), NYC Department of Design and Construction, NYC Department of Environmental Protection, NYC Mayor's Office for People with Disabilities, NYS Department of Environmental Conservation, Downtown Brooklyn Traffic Calming Study (NYC DOT: 2004), Project Development & Design Guide (Massachusetts Highway Department: 2006) [PDF], San Francisco Better Streets PlanDraft for Public Review (City and County of San Francisco: June 2008), Smart Transportation Guidebook: Planning and Designing Highways and Streets that Support Sustainable and Livable Communities (New Jersey DOT/Pennsylvania DOT: 2008) [PDF], Parks, Plants, and People: Beautifying the Urban Landscape (Lynden B. Miller: 2009), Trees in the Urban Landscape: Site Assessment, Design, and Installation (Nina L. Bassuk and Peter J. Trowbridge: 2004), Permeable Interlocking Concrete Paver (PICP), Manual on Uniform Traffic Control Devices (MUTCD), National Historic Preservation Act, Section 106, New York State Department of Environmental Conservation (Title 6), New York State Environmental Quality Review Act (SEQR), New York State Historic Preservation Act, Section 14.09, New York State Department of Transportation (Title 17), A Policy on Geometric Design of Highways and Streets, 7th edition, A Guide for Achieving Flexibility in Highway Design, Guide for the Planning, Design, and Operation of Pedestrian Facilities, Guide for the Development of Bicycle Facilities, 4th edition, BIKESAFE: Bicycle Countermeasure Selection System, PEDSAFE: Pedestrian Safety Guide and Countermeasure Selection System, Designing Sidewalks and Trails for Access, Public Involvement Techniques for Transportation DecisionMaking, MUTCD (Manual on Uniform Traffic Control Devices), Roadside Best Management Practices that Benefit Pollinators, Designing Walkable Urban Thoroughfares: A Context Sensitive Approach, The Design and Safety of Pedestrian Facilities, Accessible Public RightsofWay: Planning and Designing for Alterations, The Americans with Disabilities Act Accessibility Guidelines for Buildings and Facilities, National Menu of Best Management Practices (BMPs) for Stormwater Management, Active Design Guidelines: Promoting Physical Activity and Health in Design, High Performance Infrastructure Guidelines: Best Practices for the Public RightofWay, Standards for Green Infrastructure (DEP: 2017), ProcedureGoverning Limited Survey for Green Infrastructure, Procedure Governing Limited Geotechnical Investigation for Right-of-Way Green Infrastructure Practices, PlaNYC Sustainable Stormwater Management Plan, Specifications for Traffic Signals and Intelligent Transportation Systems Construction and Equipment, Instructions for Filing Plans and Guidelines for the Design of Sidewalks, Curbs, Roadways and Other Infrastructure Components, Select Bus Service Design Guidelines: Update, El-Space Toolkit: Strategies for Reclaiming Sites Beneath Elevated Transportation Infrastructure, Version 1.0, Park Design for the 21st Century: High Performance Landscape Guidelines, Native Planting Species Guide for New York City, Inclusive Design Guidelines: New York City, New York State Stormwater Management Design Manual, San Francisco Better Streets PlanDraft for Public Review, Smart Transportation Guidebook: Planning and Designing Highways and Streets that Support Sustainable and Livable Communities, New York State Environmental Conservation Law (ECL), New York State Vehicle and Traffic Law (VTL), Department of Citywide Administrative Services (Chapter 35), Department of Consumer Affairs (Chapter 64), Department of Design and Construction (Chapter 55), Department of Environmental Protection (Chapter 57), Department of Parks and Recreation (Chapter 21), Department of Small Business Services (Chapter 56), Department of Transportation (Chapter 71), Franchises, Revocable Consents, and Concessions (Chapter 14), Landmarks Preservation Commission (Chapter 74), Public Design Commission/Art Commission (Chapter 37), Contracts, Purchases and Franchises (Title 6), Environmental Protection and Utilities (Title 24), Department of Citywide Administrative Services (Title 55), Department of Environmental Protection (Title 15), Rules Governing the Construction of Private Sewers, Rules Governing the Use of the Water Supply, Department of Parks and Recreation (Title 56), Department of Small Business Services (Title 66), Franchise and Concession Review Committee (Title 12), Landmarks Preservation Commission (Title 63), Public Design Commission/Art Commission (Title 57), Rules of the City of New York (Title 43 and 62), U.S. Traffic Calming Manual (American Planning Association & American Society of Civil Engineers: 2009), Under the Elevated: Reclaiming Space, Connecting Communities (DOT and Design Trust for Public Space: 2015).